    Question – 1 : 2 men and 3 women can do a work in 6 days, 3 men and 9 women can complete the work in 3 days. How many men will do the same amount of work as done by 12 women?

    Answer – (A) : 4 men

    Answer – (B) : 4 men

    Answer – (C) : 6 men

    Answer – (D) : 7 men

    View Answer


    Correct Answer : (B)


    Explanation : Given:2 men and 3 women can do a work in 6 days3 men and 9 women can complete the work in 3 daysCalculation:Let the efficiency of man be M and woman be WAccording to question,(2M+3W)×6=(3M+9W)×3⇒12M+18W=9M+27W⇒12M−9M=27W−18W⇒3M=9W⇒1M=3W⇒1W=(13)M⇒12W={(13)×12}M⇒12W=4M∴ The amount of work done by 12 women is equal to the work of 4 men.



    Question – 2 : A and B together can complete a task in 1.2 days. However, if A works alone, completes half the job and leaves and then B works alone and completes the rest of the work, it takes 2.5 days in all to complete the work. If B is more efficient than A, how days would it have taken B to do the work by herself?

    Answer – (A) : 2

    Answer – (B) : 1.8

    Answer – (C) : 2

    Answer – (D) : 2.2

    View Answer


    Correct Answer : (C)


    Explanation : Let, A can complete the task in = x daysB can complete the task in = y daysAccording to the question,1x + 1y = 11.2⇒ x + y = xy1.2 …(i)A completes half the job in = x2 days and B completes half the job in = y2 days⇒ x2 + y2 = 2.5⇒ x + y = 5 …(ii)From (i) and (ii), we get,xy1.2 = 5⇒ xy = 6⇒ x = 6y …(iii)From (ii) and (iii) we get,6y + y = 5⇒ 6 + y2 = 5y⇒ y2 – 3y – 2y + 6 = 0⇒ y(y – 3) – 2(y – 3) = 0⇒ (y – 3) (y – 2) = 0⇒ y = 3 or 2For y = 3, x = 63 = 2For y = 2, x = 62 = 3∵ B is more efficient than A∴ B take less days than A∴ B would take 2 days to complete the task.



    Question – 3 : A, B, and C together work for 3 days and earned Rs. 2034 while A and C works for 2 days and earned Rs. 850. B and C together work for 5 days and earned Rs. 2350. What is the daily income of C?

    Answer – (A) : Rs. 217

    Answer – (B) : Rs. 217

    Answer – (C) : Rs. 219

    Answer – (D) : Rs. 230

    View Answer


    Correct Answer : (B)


    Explanation : Formula:Per day Income = Total IncomeNumber of daysCalculation:Total income of A, B and C is = 20343 = Rs. 678 Per dayTotal income of A and C = 8502 = Rs. 425 Per dayPer day income of B = (678 – 425) Rs. = Rs. 253Total income of B and C together = 23505 = Rs. 470 Per day∴ Per day income of C = 470 – 253 = Rs. 217



    Question – 4 : If total wages paid to Amar and Bhavesh is Rs. 960 and Bhavesh share is Rs. 540. Amar can complete the work alone in 6 days and Bhavesh can complete the work alone in 12 days. Find the ratio of time of Amar to Bhavesh to complete the work together.

    Answer – (A) : 07:18

    Answer – (B) : 05:16

    Answer – (C) : 07:23

    Answer – (D) : 07:18

    View Answer


    Correct Answer : (D)


    Explanation : Given:Total wages = Rs. 960Bhavesh share = Rs. 540Amar can complete the work = 6 daysBhavesh can complete the work = 12 daysCalculation:So, Amar share = Rs. 420Ratio of wages by Amar to Bhavesh = 420 : 540= 7 : 9Efficiency of ratio of Amar to Bhavesh = 16 : 112= 2 : 1Ratio of time of Amar to Bhavesh to complete the work together = WagesEfficiencyRatio of time of Amar to Bhavesh to complete the work together = 7921Ratio of time of Amar to Bhavesh to complete the work together = 718∴ Ratio of time of Amar to Bhavesh to complete the work together is = 7 : 18



    Question – 5 : Mukesh and Shivam took a contract to do a job for Rs. 2800. Mukesh can do the job alone in 14 days and Shivam can do the job alone in 16 days. But they called Harsh for their help and completed the work in 6 days. How much money will Harsh get?

    Answer – (A) : Rs. 550

    Answer – (B) : Rs. 570

    Answer – (C) : Rs. 560

    Answer – (D) : Rs. 550

    View Answer


    Correct Answer : (D)


    Explanation : Time taken by Mukesh =14 daysTime taken by Shivam =16 daysTime taken by Mukesh, Shivam and Harsh =6 daysTotal work = LCM of 14,16 and 6=336 units⇒ Efficiency of Mukesh =33614=24 units/day⇒ Efficiency of Shivam =33616=21 units/day⇒ Efficiency of Mukesh, Shivam and Harsh together =3366=56units/day⇒ Efficiency of Harsh = Total efficiency – Efficiency of (Mukesh +Shivam)⇒ Efficiency of Harsh =56−(24+21)=56−45=11 units/dayFor 56 units they get = Rs. 2800⇒1 unit = Rs. 50∴ Harsh’s salary =11×50= Rs. 550



    Question – 6 : P can complete a job in 30 days. Q alone can complete the same job in 20 days. P works for 18 days and then the remaining job is completed by Q. How many days will it take Q to complete the remaining job alone?

    Answer – (A) : 8 days

    Answer – (B) : 8 days

    Answer – (C) : 16 days

    Answer – (D) : 7 days

    View Answer


    Correct Answer : (B)


    Explanation : Given,P’s 1 day work =130Q’s 1 day work =120As we know,Work = Efficiency × TimeP’s 18 day work =1830=35Remaining work =1−35=25Q’s 25 day work =120×52=18Q will complete the remaining job alone in 8 days.



    Question – 7 : ‘A’ can do a piece of work in 20 days and ‘B’ can do the same work in 15 days. How long will they take to finish the work, if both work together?

    Answer – (A) : 847 days

    Answer – (B) : 10 days

    Answer – (C) : 847 days

    Answer – (D) : 20 days

    View Answer


    Correct Answer : (C)


    Explanation : If A can do a piece of work in x days and B can do it in y days then A and B working together will do the same work in work in (xyx+y) days.A’s time =x=20 daysB’s time =y=15 daysA+B can do the work =20×1520+15 days=30035=607=847 days



    Question – 8 : 12 men can complete a work in 10 days. 25 women can complete the same work in 6 days. In how many days 8 men and 4 women can complete the same work, working together?

    Answer – (A) : 1057 days

    Answer – (B) : 237 days

    Answer – (C) : 437 days

    Answer – (D) : 857 days

    View Answer


    Correct Answer : (A)


    Explanation : Given:12 men can complete a work in 10 days. 25 women can complete the same work in 6 days.Calculation:Let the work efficiency of a man and a woman be M and W respectively.We know that,Total work = Efficiency × DaysAccording to the question,Total work = 12 M × 10 = 25 W × 6⇒ MW = 54Total work = 12 × 5 × 10 = 600 unitSo, 8 men and 4 women can complete the same work, working together.600(8 × 5 + 4 × 4) = 60056⇒ 757 = 1057 days



    Question – 9 : A can do 25 of a work in 10 days. B can do 12 of the some work in 10 days. They worked together for 5 days and then A left. In how many days will B finish the remaining work?

    Answer – (A) : 11

    Answer – (B) : 10

    Answer – (C) : 11

    Answer – (D) : 9

    View Answer


    Correct Answer : (C)


    Explanation : Given:A can do 25 of a work in 10 days.B can do 12 of the some work in 10 days.Calculation:Let, the total work be 100 units.So, (25)×100=40 unitsA can do 40 units in 10 days.Also, (12)×100=50 unitsB can do 50 units in 10 days.Efficiency of A=4010=4 units/dayEfficiency of B=5010=5 units/dayEfficiency of (A+B)=9 units/dayThey both work together for 5 days.Work done in 5 days =9 units / day ×5 days =45 unitsRemaining work = Total work – Work done =100−45=55 unitsTime taken to complete the work alone =555=11 days



    Question – 10 : T alone can complete the work in 12 days. T and U together worked on a piece of work and completed one-third work in 3 days. In how many days can U alone complete the same piece of work?

    Answer – (A) : 36 days

    Answer – (B) : 40 days

    Answer – (C) : 25 days

    Answer – (D) : 30 days

    View Answer


    Correct Answer : (A)


    Explanation : Given,1 day work of T =112Let U alone can complete the work in x days.1 day work of U =1xTime taken by T and U to complete one-third work = 3 daysTime taken by T and U in completing 1 full piece of work =3÷(13) days = 9 days1 day work of T and U working together =19⇒(112)+(1x)=19⇒1x=(19)−(112)⇒x=36 days



    Question – 11 : A can complete a piece of task in 10 hours, B and C together can complete it in 12 hours, while A and C together can complete it in 6 hours. How long will B alone take to complete it?

    Answer – (A) : 60 hours

    Answer – (B) : 40 hours

    Answer – (C) : 50 hours

    Answer – (D) : 60 hours

    View Answer


    Correct Answer : (D)


    Explanation : Given:A can complete a piece of task in =10hrs .B and C together can complete in =12hrs .A and C together can complete it in =6hrs .Formula:Total work = Efficiency × Time TakenCalculation:Total work =60 unit ( LCM of 10,12,6)Efficiency of A=6010=6 units / dayEfficiency of C=(606)−6=4 units / dayEfficiency of B=(6012)−4=1 units/day∴ B alone can complete the whole work in =601=60 hrs.



    Question – 12 : A company hires 25 people and all the people can complete the work in 60 days. But seeing their disinterest, the company hires 10 more persons after every 5 days. Then how many days before the work will be finished?

    Answer – (A) : 30 days

    Answer – (B) : 60 days

    Answer – (C) : 15 days

    Answer – (D) : 30 days

    View Answer


    Correct Answer : (D)


    Explanation : Given:Total number of hired people = 2525 people can complete the work in 60 days.The company hires 10 more persons after every 5 days.Formula:Total work = total employees × total timeCalculation:Total number of hired people = 2525 people can complete the work in 60 days.Total work = 25 × 60 = 1500 unitsSo work done by 25 people in first 5 days = 25 × 5 = 125 unitsThe company hires 10 more persons after every 5 days.Now total number of people = 25 + 10 = 35So work done by 35 people in next 5 days = 35 × 5 = 175 unitsAgain in next five days, total number of people = 35 + 10 = 45So work done by 45 people in next 5 days = 45 × 5 = 225 unitsAgain in next five days, total number of people = 45 + 10 = 55So work done by 55 people in next 5 days = 55 × 5 = 275 unitsAgain in next five days, total number of people = 55 + 10 = 65So work done by 65 people in next 5 days = 65 × 5 = 325 unitsAgain in next five days, total number of people = 65 + 10 = 75So work done by 75 people in next 5 days = 75 × 5 = 375 unitsTotal work that done = 125 + 175 + 225 + 275 + 325 + 375 = 1500 unitsThus the total work is done.Now time taken by people to complete work = 5 + 5 + 5 + 5 + 5 + 5 = 30 daysNumber of days before the work will be finished = 60 – 30 = 30 days∴ The work will be finished before 30 days.



    Question – 13 : To do a certain work, A and B work on alternate days with B beginning the work on the first day. A alone can complete the same work in 24 days. If the work gets completed in 1113 days, then B alone can complete 79th part of the original work in:

    Answer – (A) : 6 days

    Answer – (B) : 6 days

    Answer – (C) : 512 days

    Answer – (D) : 412 days

    View Answer


    Correct Answer : (B)


    Explanation : Given:Time taken by A to finish a task alone =24 daysCalculation:Let the total work be =1A alone can finish the task in 24 days⇒A′ s one-day work =1/24A and B complete the whole task in =1113 daysA and B work on alternate days, with B beginning so, we can say B will work only 6 days⇒ A will work only 1113−6=513 daysIf A′ s one day work =1/24 of work A completes in 1 day⇒ A’s 513 days work =1/24×513=1/24×16/3⇒2/9Remaining work =1−2/9=7/9∴ B does the 7/9th part of the work in 6 days.



    Question – 14 : Person B is 50% more efficient than person A and time taken by person A alone to do work are 6 days more than that taken by B alone, then in how much time the work will be finished if both A and B together started working?

    Answer – (A) : 7.2 days

    Answer – (B) : 8 days

    Answer – (C) : 9.6 days

    Answer – (D) : 10.8 days

    View Answer


    Correct Answer : (A)


    Explanation : Since B is 50% more efficient than A.Ratio of efficiency of A to B = 100 ∶ 150 = 2 ∶ 3The ratio of time taken by A to B to finish the work = 12 ∶ 13 = 3 ∶ 2Let the time taken by A and B alone to do work be 3x and 2x respectively.According to the question,3x – 2x = 6⇒ x = 6Time taken by A and B alone to do work is 18 days and 12 days respectively.The efficiency of A and B when they work together = 118 + 112 = 536The required time is taken when both A and B together started working = 365 = 7.2 days



    Question – 15 : Two workers Samrat and Kamlesh started working together and completed the work in 18 days and when Samrat worked thrice as efficiently and then Kamlesh worked with half his efficiency it will take same time to finish the work. Calculate the time taken by Samrat to finish the work alone.

    Answer – (A) : 90

    Answer – (B) : 80

    Answer – (C) : 90

    Answer – (D) : 70

    View Answer


    Correct Answer : (C)


    Explanation : Given:Time taken by Samrat and Kamlesh to do the work together = 18 daysCalculation:Let the time taken by Samrat and Kamlesh to do the work alone be x and y respectively.Then, Samrat’s and Kamlesh’s 1 day work = 1x and 1y respectivelyTotal work = 1x + 1y = 118 —-(i)Samrat worked thrice as efficiently and then Kamlesh worked with half his efficiency it will take same time to finish the work.Samrat’s 1 day work = 3xKamlesh’s 1 day work = 12yTime taken by them to finish the work = 18 daysTotal work = 3x + 12y = 118 —-(ii)Multiplying (i) by 3 and subtracting (ii) by (i),3x+3y-3x-12y=318-118⇒ 3y-12y=19⇒ y = 452Putting the value of y in (ii), we get⇒ 3x+1×22×45=118⇒ 3x=118-145⇒ 3x=5-245⇒ 3x=390⇒ x = 90∴ Time taken by Samrat to finish the work alone is 90 days.



    Question – 16 : Three persons A, B and C together can do a work in 4.8 days and persons A and C can do the work together in 6 days. B and D together can do that work in 16 days, then in how many days D alone do that work?

    Answer – (A) : 48 days

    Answer – (B) : 36 days

    Answer – (C) : 40 days

    Answer – (D) : 60 days

    View Answer


    Correct Answer : (A)


    Explanation : Let the time taken by A, B, C and D alone to do that work is A, B, C and D days respectively.According to the question,1A + 1B + 1C = 14.8 —-(1)1A + 1C = 16 —- (2)From (1) and (2),16 + 1B = 14.8⇒ 1B=14.8-16⇒ 1B=5-424B = 24 daysGiven that:1B + 1D = 116⇒ 124 + 1D = 116⇒ 1D=116-124⇒ 1D=3-248D = 48 days



    Question – 17 : A, B, C, D and E was allotted a work costing for Rs. 13200. Together, A and B are completing 511 of the work and C and D are completing 12 of the work. Find the amount received by E for the work.

    Answer – (A) : Rs. 600

    Answer – (B) : Rs. 660

    Answer – (C) : Rs. 800

    Answer – (D) : Rs. 600

    View Answer


    Correct Answer : (D)


    Explanation : Given:Total amount = Rs. 13200Work done by (A + B) = 511 workWork done by (C + D) = 12 workConcept used:Work done ∝ WagesCalculation:Work done by (A + B + C + D + E) = 1 unitWork done by (A + B) + (C + D) = 511 + 12Net work done by (A + B) + (C + D) = 2122Work done by E = 1 – 2122 = 122Ratio of work of (A + B) : (C + D) : E = 511 : 12 : 122= 10 : 11 : 1Ratio of wages of (A + B) : (C + D) : E = 10 : 11 : 1Share of E = 13200 × 122= 600∴ The amount received by E for the work is Rs. 600



    Question – 18 : Three taps A,B , and C can fill a tank in 180,20 , and 90 minutes respectively. If all the taps are opened together, then in how many minutes will the tank be filled?

    Answer – (A) : 15

    Answer – (B) : 25

    Answer – (C) : 30

    Answer – (D) : 35

    View Answer


    Correct Answer : (A)


    Explanation : Tap A can fill the tank =180 minutesTap A ’s one-minute work =1180Tap B can fill the tank =20 minutesTap B ’s one-minute work =120Tap C can fill the tank =90 minutesTap C ’s one-minute work =190When all the taps are opened together,A+B+C=(1180+120+190)=(1+9+2)180=12180=115So, (A+B+C) working together can fill the whole tank in 15 minutes.



    Question – 19 : Two teachers A and B can complete an academic work in 10 days and 15 days respectively. They started the work together, but A left after 5 days and another teacher C joined, who alone can complete the work in 60 days. In how many days the work got completed?

    Answer – (A) : 7

    Answer – (B) : 5

    Answer – (C) : 6

    Answer – (D) : 2

    View Answer


    Correct Answer : (A)


    Explanation : Let total work be 60x units (LCM of 10,15,60 )Efficiency of A=6x units/dayEfficiency of B=4x units/dayEfficiency of C=x units/dayWork done in 5 days by A and B=(6x+4x)×5=50x unitsRemaining work =60x−50x=10x unitsThis work is completed by B and C .Time taken to complete the remaining work =10x(4x+x)=10x5x=2 days∴ Total time taken to complete the work =5+2=7 days



    Question – 20 : A can plough a square field of side 10 m in 10 hours and that can be done by B in 5 hours. In how much time a new field having a 50% larger side and square in shape is ploughed if A and B plough together?

    Answer – (A) : 7.5 hours

    Answer – (B) : 9.5 hours

    Answer – (C) : 7.5 hours

    Answer – (D) : 5.5 hours

    View Answer


    Correct Answer : (C)


    Explanation : Given:Length of the side of square-shaped field = 10 mTime taken by A to plough the field = 10 hoursTime taken by B to plough the field = 5 hoursPercentage increase in the side of the new square-shaped field = 50%Formula:Area of Square = (side)2Work efficiency = (Total Work)(Total time)Calculation:Area of the field to be ploughed = (side)2 = 100 m2The efficiency of A to plough the field = (Area of field)(Total Time)= 10010 = 10 m2/hour —(1)The efficiency of B to plough the field = (Area of field)(Total Time)= 1005 = 20 m2/hour —(2)Length of side of new field = 10 + 10×50100= 10 + 5 = 15 mArea of new field = (side)2= 152= 225 m2Colletive efficiency of A and B = (10 + 20) m2/hour —(By adding (1) and (2))= 30 m2/hourTotal time taken by A and B to plough together = (Area of field)(Collective efficiency of A and B)= 22530= 7.5 hours∴ A and B will take 7.5 hours to plough the new field.



    Question – 21 : A group of men decided to do a job in 4 days. But since 20 men dropped out every day, the job completed at the end of the 7 day. How many men were there at the beginning?

    Answer – (A) : 140

    Answer – (B) : 140

    Answer – (C) : 280

    Answer – (D) : 150

    View Answer


    Correct Answer : (B)


    Explanation : Let X be the initial number of men then,According to the question,4X=X+(X−20)+(X−40)+(X−60)+(X−80)+(X−100)+(X−120)⇒4X=7X−420⇒3X=420⇒X=4203⇒X=140 men



    Question – 22 : Total efficiency of A and B is twice that of C and D. That’s why A and B can finish a work in 12 days less time than C and D. If they start working together then how much time will it take to finish the same work?

    Answer – (A) : 8 days

    Answer – (B) : 5 days

    Answer – (C) : 8 days

    Answer – (D) : 8 days

    View Answer


    Correct Answer : (C)


    Explanation : Formula:Total Work Done = Capacity × TimeCalculation:We are assuming total work is 1 unit.Let Capacity of A and B is x unit per day.And Capacity of C and D is y unit per day.According to the question,x = 2y ….(i)And, 1y – 1x = 12⇒ (x – y)xy = 12Now, putting x = 2y in above equation,(2y – y)2y2 = 12⇒ y = 24y2⇒ y = 124From equation (i) we get,⇒ x = 112So, Total time required = 1112 + 124= 24(2 + 1)= 8 days



    Question – 23 : A man, a woman, and a boy can do a work in 20, 30, and 40 days respectively. How many women are required to finish the remaining task in 1 day if to finish twice of work 5 boys and 4 men worked for 4 days and then left?

    Answer – (A) : 21

    Answer – (B) : 25

    Answer – (C) : 23

    Answer – (D) : 21

    View Answer


    Correct Answer : (D)


    Explanation : Given:Time is taken by a man to do the work = 20 daysTime is taken by a woman to do the work = 30 daysTime is taken by a boy to do the work = 40 daysFormula:Total work = Efficiency × Time is takenCalculation:Let the total work be x unitsThe efficiency of a man = x20The efficiency of a woman = x30The efficiency of a boy = x40So the efficiency of 4 men = 4 × x20 = x5Now efficiency of 5 boys = 5 × x40 = x8The total efficiency of 4 men and 5 boys = x5 + x8 = 13×40Now the work is done by 4 men and 5 boys in 4 days.⇒ 4 × 13×40 units= 13×10 unitsRemaining work = 2x – initial work= 2x – 13×10 = 7×10So the remaining work is done in 1 day by women.Now the number of women = remaining workefficiency of a woman⇒ 7x10x30 = 21 women∴ Need 21 women assist to complete work in 1 day.



    Question – 24 : A can build a wall in 12 days, B can do the same in 16 days, and C can do it in 24 days. Totally 6 walls are to be built. ‘A’ does the work for the first 16 days and ‘B’ continues the work for the next 12 days. How many days should C work?

    Answer – (A) : 94

    Answer – (B) : 47

    Answer – (C) : 48

    Answer – (D) : 24

    View Answer


    Correct Answer : (A)


    Explanation : We know, Time × rate = workLet’s consider the work of building one wall to be 48 units. (LCM of 12, 16, and 24 )A total of 6 walls are to be built. i.e. 6 × 48 = 288 unitsABCTime121624Rate432Work484848Thus, rates of A, B, and C are 4, 3, and 2 respectively per day.Work done by A ( 1st 16 days) = 4 × 16 = 64Work done by B (next 12 days) = 3 × 12 = 36Total work done by A and B = 64 + 36 = 100 unitsWork remaining = 288 – 100 = 188 unitsSo, Work done by C = 188 = 2 × no. of days C has to work∴ No. of days C has to work =1882=94 days



    Question – 25 : The ratio of efficiency of a man, woman and child is 7:3:2 . The number of days for which they work is in the ratio 3:9:11 . If they together earn rupees 7000 , then what will be the income of children?

    Answer – (A) : Rs. 2200

    Answer – (B) : Rs. 2000

    Answer – (C) : Rs. 2100

    Answer – (D) : Rs. 2400

    View Answer


    Correct Answer : (A)


    Explanation : Given:Ratio of efficiency of a man, woman and child =7:3:2Ratio of the number of days for which they work =3:9:11Total earning by working together = Rs. 7000Calculation:Share of the total work done by men, women and children =(7×3):(3×9):(2×11)⇒ Share of the total work done by men, women and children =21:27:22Total work done =(21+27+22)=70 unitsWage will be distributed in the ratio of work done by them70 units = Rs. 70001 unit =700070⇒1 unit = Rs. 100Share of work done by children =22 units⇒22 units =22×100⇒22 units = Rs. 2200∴ The income earned by children is Rs. 2200.



    Question – 26 : 2M + 5W + 6C does a work in 72 hours while 4M + 10C can complete the same work in 90 hours and 3M + 5W can complete the same work in 120 hours, then find in how much time will 5M + 4C complete the work.

    Answer – (A) : 180 hours

    Answer – (B) : 120 hours

    Answer – (C) : 160 hours

    Answer – (D) : 180 hours

    View Answer


    Correct Answer : (D)


    Explanation : Given:2M + 5W + 6C = 72 hours4M + 10C = 90 hours3M + 5W = 120 hoursFormula:Efficiency = total work/total daysCalculation:Let total work be xTotal efficiency of 2M + 5W + 6C = x72 —-(1)Total efficiency of 4M + 10C = x90 —-(2)Total efficiency of 3M + 5W = x120 —-(3)Add equation (2) and (3),4M + 10C + 3M + 5W = x90 + x120⇒ 7M + 5W + 10C = (4x + 3x)360⇒ 7M + 5W + 10C = 7×360Total efficiency of 7M + 5W + 10C = 7×360 —-(4)Subtract equation (1) from equation (4),7M + 5W + 10C – (2M + 5W + 6C) = 7×360 – x72⇒ 5M + 4C = (7x – 5x)360⇒ 5M + 4C = 2×360Total efficiency of 5M + 4C = 2×360Time taken by 5M + 4C to complete the work = x2x360⇒ 3602 = 180 hours∴ Time taken by 5M + 4C to complete the work is 180 hours.



    Question – 27 : The efficiencies of A,B and C are in the ratio 5:3:2 working together, they can complete a task in 21 hours. In how many hours will B alone complete 40% of that task?

    Answer – (A) : 28

    Answer – (B) : 24

    Answer – (C) : 21

    Answer – (D) : 35

    View Answer


    Correct Answer : (A)


    Explanation : The efficiencies of A,B and C are in the ratio of 5:3:2 .Total work =(5+3+2)×21=21040% of the total work =210×40100=8440% of the total work completed by B in =843=28 hours



    Question – 28 : Sakshi can do a piece of work in 20 days. Tanya is 25% more efficient than Sakshi. The number of days taken by Tanya to do the same piece of work is:

    Answer – (A) : 16

    Answer – (B) : 16

    Answer – (C) : 18

    Answer – (D) : 25

    View Answer


    Correct Answer : (B)


    Explanation : Ratio of times taken by Sakshi and Tanya =125:100=5:4Suppose Tanya takes x days to do the work.5:4:20:x⇒x=(4×205)⇒x=16 daysHence, Tanya takes 16 days to complete the work.



    Question – 29 : A, B, and C can finish a work in 6, 12, and 15 days respectively. They started working together but after 3 days they left and D joined and finished the rest of the work in 2 days alone. How much time D will take to finish the same work alone?

    Answer – (A) : 40 days

    Answer – (B) : 30 days

    Answer – (C) : 40 days

    Answer – (D) : 50 days

    View Answer


    Correct Answer : (C)


    Explanation : Given:A can finish the work = 6 daysB can finish the work = 12 daysC can finish the work = 15 daysTime taken by D to finish the remaining work = 2 daysFormula:Total Work Done = Capacity × TimeCalculation:We are assuming total work is 1 unit.1 day work of A = 161 day work of B = 1121 day work of C = 115Total work of A, B, and C in 3 days = 16+112+115×3Remaining work after 3 days = 1 – 16 + 112 + 115 × 3= 1 – 12 + 14 + 15= 1 – (10 + 5 + 4)20= 1 – 1920= 120 unitD completed the 120 unit of work = 2 daysSo, he will do 1 unit of work = 20×2 = 40 days∴ Time taken by D to finish the whole work = 40 days.



    Question – 30 : A can complete a work in 18 days, B can complete the same work 12.5% more efficiently than A . In what time, A and B can complete the same work working together?

    Answer – (A) : 8817 days

    Answer – (B) : 8817 days

    Answer – (C) : 9 days

    Answer – (D) : 4917 days

    View Answer


    Correct Answer : (B)


    Explanation : Given:Days taken by A to complete the work =18 daysB is 12.5% more efficient than AConcept used:Efficiency is inversely proportional to the time.Calculation:12.5%=18Let efficiency of A be 8 unitsAnd efficiency of B be 9 units.A : B (Efficiency) = 8 : 9A : B (Time)= 9 :8From this,Time taken by A=9 units⇒9 units =18 days⇒1 unit =2 days⇒8 units =2×8=16 daysTake L.C.M. of 16,18 and make it as total work i.e. 144 units Total work =144 unitsTotal efficiency A+B=8+9=17 unitsTime taken =14417=8817∴ The time taken by A and B to complete the work together is 8817 days.



    SSC CGL TIME AND WORK MCQ ENGLISH

    SSC CGL TIME AND WORK MCQ ENGLISH

    SSC CGL TIME AND WORK MCQ ENGLISH

    SSC CGL TIME AND WORK MCQ ENGLISH

    SSC CGL TIME AND WORK MCQ ENGLISH

    SSC CGL TIME AND WORK MCQ ENGLISH

    SSC CGL TIME AND WORK MCQ ENGLISH

    SSC CGL TIME AND WORK MCQ ENGLISH

    SSC CGL TIME AND WORK MCQ ENGLISH

    SSC CGL TIME AND WORK MCQ ENGLISH

    SSC CGL TIME AND WORK MCQ ENGLISH

    SSC CGL TIME AND WORK MCQ ENGLISH

    SSC CGL TIME AND WORK MCQ ENGLISH

    SSC CGL TIME AND WORK MCQ ENGLISH

    SSC CGL TIME AND WORK MCQ ENGLISH

    SSC CGL TIME AND WORK MCQ ENGLISH

    SSC CGL TIME AND WORK MCQ ENGLISH

    SSC CGL TIME AND WORK MCQ ENGLISH

    SSC CGL TIME AND WORK MCQ ENGLISH

    SSC CGL TIME AND WORK MCQ ENGLISH

    SSC CGL TIME AND WORK MCQ ENGLISH

    SSC CGL TIME AND WORK MCQ ENGLISH

    SSC CGL TIME AND WORK MCQ ENGLISH

    SSC CGL TIME AND WORK MCQ ENGLISH

    SSC CGL TIME AND WORK MCQ ENGLISH

    SSC CGL TIME AND WORK MCQ ENGLISH

    SSC CGL TIME AND WORK MCQ ENGLISH

    SSC CGL TIME AND WORK MCQ ENGLISH

    SSC CGL TIME AND WORK MCQ ENGLISH

    SSC CGL TIME AND WORK MCQ ENGLISH

    SSC CGL TIME AND WORK MCQ ENGLISH

    SSC CGL TIME AND WORK MCQ ENGLISH

    SSC CGL TIME AND WORK MCQ ENGLISH

    SSC CGL TIME AND WORK MCQ ENGLISH

    SSC CGL TIME AND WORK MCQ ENGLISH

    SSC CGL TIME AND WORK MCQ ENGLISH

    SSC CGL TIME AND WORK MCQ ENGLISH

    SSC CGL TIME AND WORK MCQ ENGLISH

    SSC CGL TIME AND WORK MCQ ENGLISH

    SSC CGL TIME AND WORK MCQ ENGLISH

    SSC CGL TIME AND WORK MCQ ENGLISH

    SSC CGL TIME AND WORK MCQ ENGLISH

    SSC CGL TIME AND WORK MCQ ENGLISH

    SSC CGL TIME AND WORK MCQ ENGLISH

    SSC CGL TIME AND WORK MCQ ENGLISH

    SSC CGL TIME AND WORK MCQ ENGLISH

    SSC CGL TIME AND WORK MCQ ENGLISH

    SSC CGL TIME AND WORK MCQ ENGLISH

    SSC CGL TIME AND WORK MCQ ENGLISH

    SSC CGL TIME AND WORK MCQ ENGLISH

    SSC CGL TIME AND WORK MCQ ENGLISH

    SSC CGL TIME AND WORK MCQ ENGLISH

    SSC CGL TIME AND WORK MCQ ENGLISH

    SSC CGL TIME AND WORK MCQ ENGLISH

    SSC CGL TIME AND WORK MCQ ENGLISH

    SSC CGL TIME AND WORK MCQ ENGLISH

    SSC CGL TIME AND WORK MCQ ENGLISH

    SSC CGL TIME AND WORK MCQ ENGLISH

    SSC CGL TIME AND WORK MCQ ENGLISH

    SSC CGL TIME AND WORK MCQ ENGLISH

    SSC CGL TIME AND WORK MCQ ENGLISH

    SSC CGL TIME AND WORK MCQ ENGLISH

    Recent Articles